We had to do a final project, which is due early Monday morning.
Our group is made up of 4 people including me.
The project was to write a C++ program that will inlcude small codes from different C++ topics. One function would deal with arrays,, another one with pointers and yada yada.
I told the guys this:"WRITE WHAT EVER PIECE OF CODE YOU WANT, no matter what it is, and give it to me. If its too simple I will add things to it, if you find that difficult, just copy a program from the book and I will alter it."
Only the girl did that. The other two, didnt do jackshit. I was ready to overlook that, as long as they showed up at the girls apartment so we can talk who is gonna present what.
ALL of the PP presentation was made by me, ALL the code was writen by ME. I even wrote the pseucode for the, so they will know tomorow what to say.
None of them showed up. Well one showed up, but he came after we waited for him for 2 hours, at that time, I was already at the door and left.
Now am thinking, that I gave them big latitude and I was very flexible, but they just pissed on me and the girl all these months.
What I wanna do tomorow after the presentation and after class, is to call them all up and tell word by word the situtation. Having a free ride like that would be plain stupid from my part and the girls part.
REMEMBER, if they would show up tonight, I wouldnt be upset at all, but they just wrote us off.
Should I nail them to the instructor and me and the girl take the credit we deserve or what?
Thank you.